National Transportation Safety Board investigators said the bridge collapse was unavoidable, once U-10 steel gusset plates failed. They also ruled out any pre-existing cracking as a factor in the accident.
The hearing quickly focused on the U-10 gusset plates of the I-35W bridge. The NTSB as far back as January had identified design flaws in the plates as a critical factor in the collapse.
The bridge shuddered and then tumbled into the Mississippi River on Aug. 1, 2007 during evening rush hour, killing 13 and injuring 145.
A final ruling is expected near the end of a two-day hearing at which NTSB investigators are laying out what they have learned since the accident -- a harrowing event seen by many as a wake-up call for a nation that had neglected its infrastructure for too long.
Board member Kitty Higgins asked investigator Jim Wildey how he could rule our corrosion as the reason for the gussets' failure. If corrosion had been involved, it might have indicated a maintenance or inspection failure by state officials.
"In the case of these gusset plates at node U-10, there simply was no corrosion to identify in any areas associated with the fracture," Wildey replied.
Democrats in Minnesota heaped criticism on the state's Republican governor, Tim Pawlenty. Democrats in Congress said the accident showed the nation's roads and bridges were crumbling.
Board members, though, vowed in advance of Thursday's hearing to keep politics out of their deliberations.
"We are here, not to protect other agencies or other organization, we are not here to point fingers or to lay blame, or find fault ... We are not here to push personal agendas. We're here to seek the truth," said board member Robert Sumwalt.
An interim NTSB report in January cited a design error as the likely culprit for the collapse of the 40-year-old bridge: 16 fractured gusset plates. The plates, components that helped connect steel beams, were designed at only half the required thickness.
At the time, safety board chairman Mark Rosenker called that design error a "critical factor" in the collapse. He also said there was little chance that state bridge inspectors would have noticed undersized gusset plates.
Pawlenty took that as a measure of vindication because the initial focus had been on his administration's program for maintaining bridges.
Rosenker's comments angered Rep. Jim Oberstar, a Minnesota Democrat who chairs the House Transportation Committee. Oberstar argued that the early pronouncement committed the safety board to a finding that might not bear out with further investigation.
Following the January report, internal NTSB memos have focused on the gusset plates and the weight of construction materials on the bridge for a resurfacing project at the time of the collapse.
But even if the NTSB excludes other potential causes, such as cracking, corrosion or other wear, pressure will remain on states to ramp up maintenance and inspections.
"Regardless of the final determination on that case, it brought to people's attention the fact that our infrastructure is aging," said Greg Cohen, president of the American Highway Users Alliance, an advocacy group representing a wide range of motorists.
"No state wants to be the next state that this happens to," said Cohen.
During his campaign for the White House, President-elect Barack Obama cited the Minneapolis bridge collapse and called for spending more on the nation's crumbling highways, bridges and tunnels.
In July, the House passed legislation authorizing an additional $1 billion next year to rebuild structurally deficient bridges on the national highway system. The bill would also require states to come up with repair plans for troubled bridges.
The Senate has yet to act on the bill. If no action is taken during a lame-duck session that starts next week, lawmakers would have to start anew on the legislation in January.